P-443 Pier 6 Replacement

San Diego, CA

PROJECT FEATURES

    • Design-Build
    • Demolition
    • Reinforced concrete pier construction
    • Pile driving: 24-inch prestressed concrete piles

AWARDS

    2023 | AGC of San Diego, Build San Diego Award, Merit Award for Unique Special Project
    2024 | International Partnering Institute, John L. Martin Partnered Project of the Year, Diamond Award in the Category 2 Civil Construction Buildings/Public Infrastructure $25M–$250M
    2024 | AGC, Construction Risk Partners Build America Awards, Merit Award for Infrastructure

PROJECT PURPOSE

The purpose of this Design-Build project was to replace the existing pier at Naval Base San Diego with a new, larger pier capable of accommodating modern naval vessels. The new pier is a 1,500-ft by 120-ft concrete pier supported by 516 prestressed concrete piles.