Installation of Tripod Platform

Gulf of Mexico

PROJECT FEATURES

    • Deck installation
    • Water depth: 280 ft.
    • Tripod jacket 500 tons

AWARDS

PROJECT PURPOSE

This project involved the installation of a tripod offshore platform using the derrick barge E.P.PAUP. The 500-ton tripod jacket was transported to the site and lowered 280 ft. to the sea floor. Crews used an S-280 hammer to drive the piles into the sea floor, securing the platform, and followed with deck installation.