Installation of Tripod Platform
Gulf of Mexico
PROJECT FEATURES
- • Deck installation
• Water depth: 280 ft.
• Tripod jacket 500 tons
AWARDS
-
PROJECT PURPOSE
This project involved the installation of a tripod offshore platform using the derrick barge E.P.PAUP. The 500-ton tripod jacket was transported to the site and lowered 280 ft. to the sea floor. Crews used an S-280 hammer to drive the piles into the sea floor, securing the platform, and followed with deck installation.