6-Pile Platform Removal

Gulf of Mexico

PROJECT FEATURES

    • Manson removed the platform with the derrick barge E.P. PAUP
    • Platform weight: Deck 397 tons | Jacket 610 tons
    • Water depth: 71 ft.
    • Project site located 30 miles offshore

AWARDS

PROJECT PURPOSE

The purpose of this project was to remove a six pile oil platform in the Gulf of Mexico. The platform piles were severed, then the entire structure was lifted and placed on a barge for disposal.