Isla Grande Terminal Improvements, Phase I: New LO/LO Pier and Berth Dredging
San Juan, PR
PROJECT FEATURES
- • Pile driving steel pipe piles up to 36-in. in diameter
• Driving 441 steel piles to support the new approach platform, pier and trestle
• Installation of a 427 ft. combination wall bulkhead consisting of 42 single H-piles, 20 double H-piles, and 60 sheet pile pairs
• Using a clamshell dredge, removed approximately 382,000 cubic yards of material
AWARDS
-
PROJECT PURPOSE
This project provided improvements to the Crowley Liner Services Isla Grande Terminal in order to support cargo loading operations. Manson’s performed all the in-water work including the installation of a combination wall bulkhead, pile driving and berth dredging.