top of page

Hueneme Outfall Replacement

Hueneme, CA

PROJECT FEATURES

    • Outfall extends more than 5,000 ft. offshore
    • Horizontal directional drilling (HDD)
    • Trenchless installation of wastewater force main
    • Marine trench installation of wastewater force main

AWARDS

PROJECT PURPOSE

This project consisted of the construction of a one-mile-long HDPE ocean outfall pipeline located in the Port Hueneme Beach Parking Lot. Pipeline installation involved conventional trenching techniques, horizontal directional drilling (HDD), and direct placement on the seafloor.

bottom of page