City of Rehoboth Beach Ocean Outfall Project

Rehoboth Beach, DE

PROJECT FEATURES

    • 3,800 LF of pipe installed via Horizontal Directional Drilling
    • 2,200 LF of pipe installed in a subaqueous trench
    • Concrete marine mattresses were placed over the trench using sonar positioning and extensive surveying

AWARDS

    "We were pleased with the professional craftsmanship, ingenuity, and determination Manson displayed while overcoming project challenges to result in successful completion of the project. It was very apparent that Manson maintains a SAFETY FIRST culture at all times.” - Sharon Lynn, City Manager, City of Rehoboth Beach, Delaware

PROJECT PURPOSE

This project installed approximately 6,000 LF of ocean outfall pipe extending 5,500 ft. offshore, as part of a larger overall project of the City’s to upgrade their Wastewater Treatment Plant.