City of Rehoboth Beach Ocean Outfall Project
Rehoboth Beach, DE
PROJECT FEATURES
- • 3,800 LF of pipe installed via Horizontal Directional Drilling
• 2,200 LF of pipe installed in a subaqueous trench
• Concrete marine mattresses were placed over the trench using sonar positioning and extensive surveying
AWARDS
- "We were pleased with the professional craftsmanship, ingenuity, and determination Manson displayed while overcoming project challenges to result in successful completion of the project. It was very apparent that Manson maintains a SAFETY FIRST culture at all times.” - Sharon Lynn, City Manager, City of Rehoboth Beach, Delaware
PROJECT PURPOSE
This project installed approximately 6,000 LF of ocean outfall pipe extending 5,500 ft. offshore, as part of a larger overall project of the City’s to upgrade their Wastewater Treatment Plant.