Elliott Bay Seawall Replacement Project
Seattle, WA
PROJECT FEATURES
- • Removing existing piling, rip rap and seawall panels
• Installing new precast seawall panels
• Placing cast-in-place and precast superstructure components
• Coordinating with multiple simultaneous waterfront projects
• Excavation and soil improvements through jet grouting
• Placing marine mattresses and other habitat improvements
• Installing utilities and outfalls
• Installing a new sidewalk with light penetrating surfaces
AWARDS
- 2017 | American Public Works Association, Washington State Chapter | Project of the Year Award
2018 | Construction Management Assoc. of America, PNW Chapter | Project of the Year - Infrastructure
PROJECT PURPOSE
This joint venture General Contractor/Construction Manager (GC/CM) contract involved replacing the aging and deteriorated seawall along Seattle's downtown waterfront. As a GC/CM, the joint venture participated in the preconstruction services, beginning nine months prior to the start of construction supporting the development of the design and performance of all project components.