P-327: Demolition & Replacement of Pier 12 and Upgrade to Pier 13
San Diego, CA
PROJECT FEATURES
- • Design-build
• Demolition
• New concrete pier construction
• Pile driving – 24 in. concrete octagonal piles
• Berth deepening – dredged approximately 441,158 cubic yards of material
AWARDS
-
PROJECT PURPOSE
This project replaced the existing Pier 12 with a new 1,500 ft. by 117 ft. general purpose berthing pier and provided upgrades to Pier 13 at Naval Base San Diego. The finished pier is designed for berthing large naval ships.