Pier 4 Phase 2 Reconfiguration

Tacoma, WA

PROJECT FEATURES

    Demolition
    Clamshell dredging and disposal of approximately 465,000 cubic yards of material
    Construction of 1,750 LF of new wharf
    Pile driving 24 in. octagonal concrete piles ranging in length from 70 ft. to 170 ft.
    Pile driving 1,308 LF of steel sheet piles
    Slope stabilization methods including rip rap placement and stone column installation

AWARDS

PROJECT PURPOSE

This project aligned Pier 4 with the neighboring Pier 3 to create one contiguous 2,960 ft. long pier structure capable of simultaneously berthing two ultra-large container ships.