2018-2020 Port of Alaska Maintenance Dredging
Anchorage, AK
PROJECT FEATURES
- • Hopper dredged approximately 3,000,871 cubic yards of material
• Material disposed of at a deep-water disposal site
AWARDS
-
PROJECT PURPOSE
This project provided maintenance dredging for a three-year cycle at the Port of Alaska. The Port of Alaska experiences the second largest tidal swing in the world causing extensive shoaling, dredging is required to maintain the required depths for the Port to accommodate deep draft cargo vessels.