top of page

Elberon to Loch Arbour Reach, Contract 2 Deal to Elberon

Sandy Hook, NJ

PROJECT FEATURES

    • Hopper dredge GLENN EDWARDS pumped over 3 million cubic yards of beach fill onshore.
    • Sand was placed along two miles of the Loch Deal-Elberon shoreline.

AWARDS

PROJECT PURPOSE

This beach renourishment project for the U.S. Army Corps of Engineers was prompted by Hurricane Sandy, which washed away a significant portion of the beaches in this area. To protect the coast, Manson performed this job on an emergency basis. 

bottom of page