top of page
75_15_109 (1).jpg
75_15_109 (1).jpg
1/1
Elberon to Loch Arbour Reach, Contract 2 Deal to Elberon
Sandy Hook, NJ
PROJECT FEATURES
- • Hopper dredge GLENN EDWARDS pumped over 3 million cubic yards of beach fill onshore.
• Sand was placed along two miles of the Loch Deal-Elberon shoreline.
AWARDS
-
PROJECT PURPOSE
This beach renourishment project for the U.S. Army Corps of Engineers was prompted by Hurricane Sandy, which washed away a significant portion of the beaches in this area. To protect the coast, Manson performed this job on an emergency basis.
bottom of page