Project Features

  • Manson removed the platform with the derrick barge E.P. PAUP
  • Platform weight: Deck 397 tons | Jacket 610 tons
  • Water depth: 71’
  • Project site located 30 miles offshore

Project Purpose

This removed a six pile oil platform in the Gulf of Mexico. The platform piles were severed, then the entire structure was lifted and placed on a barge for disposal.