Rehoboth Beach Ocean Outfall 

Rehoboth Beach, DE

Project Features

  • 3,800 LF of pipe installed via Horizontal Directional Drilling
  • 2,200 LF of pipe installed in a subaqueous trench
  • Concrete marine mattresses were placed over the trench using sonar positioning and extensive surveying

Project Purpose

This project installed approximately 6,000 LF of ocean outfall pipe extending 5,500’ offshore, as part of a larger overall project of the City’s to upgrade their Waste Water Treatment Plant.

Services Provided