Design-Build, P-327 Demolition and Replacement of Pier 12 and Upgrades to Pier 13

San Diego, CA

Project Features

  • Design-build
  • Demolition
  • New concrete pier construction
  • Pile driving – 24” concrete octagonal piles
  • Berth deepening – dredged approximately 441,158 cubic yards of material

Project Purpose

This project replaced the existing Pier 12 with a new 1,500’ by 117’ general purpose berthing pier and provided upgrades to Pier 13 at the San Diego Naval Base. The finished pier is designed for berthing large naval ships.

Services Provided