Manson Construction Company
  • Careers
  • Connect
  • Who We Are
    • About Us
      • Values
      • Culture
    • Values
    • Ethics
    • Culture
    • Heritage
  • What We Do
    • Services
    • Marine Construction
      • Design-Build Evergreen Point Floating Bridge and Landings
      • SFOBB Pier Demolition- Phase 2, Piers E4-E18 Foundation Removal
      • Manette Bridge Replacement
      • Middle Harbor Redevelopment Project
      • Pier 4 Phase 2 Reconfiguration
      • Port of Neah Bay Commercial Dock Replacement
      • Port of Redwood City Projects
      • TraPac Terminal Expansion, Berth 145-147
      • Port of Juneau Cruise Ship Berths
      • New Construction Ferry Terminal
      • Isla Grande Terminal Improvements, Phase I: New LO/LO Pier and Berth Dredging
      • Design-Build, P-327 Demolition and Replacement of Pier 12 and Upgrades to Pier 13
      • Mile Point Training Wall Reconfiguration
      • Elliott Bay Seawall Replacement Project
      • Rehoboth Beach Ocean Outfall
      • Pier 57 Piling and Ferris Wheel Foundation
    • Dredging
      • Channel Deepening, Los Angeles and Long Beach Harbors
      • Wilmington Harbor Maintenance Dredging FY17
      • 2015-2017 Port of Alaska Maintenance Dredging
      • Channel Islands, Channel Island and Port Hueneme Harbor Maintenance Dredging FY13-FY16
      • Maintenance Dredging Jacksonville Port Authority 2011-2016
      • MsCIP Barrier Island Restoration Cat Island Beach and Dune Fill
      • FY18 Shoalwater Dune Repair
      • Long Branch Beach Fill Nourishment
      • Murderkill River Dredging
      • Oakland Harbor Navigation Improvements, 50’ Deepening Project Phase 3E
    • Offshore
      • Six Pile Platform Removal-VR-124E
      • Removal of 8 Pile and 4 Pile Bridged Complex, High Islands A-517
      • Eight Pile Platform Removal VR 26 G
      • Deck Installation PL 18 C
      • Drillship BOP Heavy Lift
      • Four Pile Removal with a Jacket Reef – EI 254 A
      • Four Pile Removal with a Jacket Reef GI 78 A
      • Four Pile Removal with a Jacket Reef- WC 557C
    • Heavy Lift
      • Heavy Lift – Airplane Salvage
      • Heavy Lift – Transformer
      • Heavy Lift – Catamaran Launch
      • Heavy Lift – Vessel Salvage
      • Heavy Lift -Vessel Salvage EVENTIDE
      • Melones Island Mooring Facility Equipment Rental
    • Fleet
  • Work With Us
    • Clients and Business Partners
    • Subcontractors and Suppliers
    • Career Opportunities
    • Internship Program

Heavy Lift

  • Services
  • Marine Construction
    • Design-Build Evergreen Point Floating Bridge and Landings
    • SFOBB Pier Demolition- Phase 2, Piers E4-E18 Foundation Removal
    • Manette Bridge Replacement
    • Middle Harbor Redevelopment Project
    • Pier 4 Phase 2 Reconfiguration
    • Port of Neah Bay Commercial Dock Replacement
    • Port of Redwood City Projects
    • TraPac Terminal Expansion, Berth 145-147
    • Port of Juneau Cruise Ship Berths
    • New Construction Ferry Terminal
    • Isla Grande Terminal Improvements, Phase I: New LO/LO Pier and Berth Dredging
    • Design-Build, P-327 Demolition and Replacement of Pier 12 and Upgrades to Pier 13
    • Mile Point Training Wall Reconfiguration
    • Elliott Bay Seawall Replacement Project
    • Rehoboth Beach Ocean Outfall
    • Pier 57 Piling and Ferris Wheel Foundation
  • Dredging
    • Channel Deepening, Los Angeles and Long Beach Harbors
    • Wilmington Harbor Maintenance Dredging FY17
    • 2015-2017 Port of Alaska Maintenance Dredging
    • Channel Islands, Channel Island and Port Hueneme Harbor Maintenance Dredging FY13-FY16
    • Maintenance Dredging Jacksonville Port Authority 2011-2016
    • MsCIP Barrier Island Restoration Cat Island Beach and Dune Fill
    • FY18 Shoalwater Dune Repair
    • Long Branch Beach Fill Nourishment
    • Murderkill River Dredging
    • Oakland Harbor Navigation Improvements, 50’ Deepening Project Phase 3E
  • Offshore
    • Six Pile Platform Removal-VR-124E
    • Removal of 8 Pile and 4 Pile Bridged Complex, High Islands A-517
    • Eight Pile Platform Removal VR 26 G
    • Deck Installation PL 18 C
    • Drillship BOP Heavy Lift
    • Four Pile Removal with a Jacket Reef – EI 254 A
    • Four Pile Removal with a Jacket Reef GI 78 A
    • Four Pile Removal with a Jacket Reef- WC 557C
  • Heavy Lift
    • Heavy Lift – Airplane Salvage
    • Heavy Lift – Transformer
    • Heavy Lift – Catamaran Launch
    • Heavy Lift – Vessel Salvage
    • Heavy Lift -Vessel Salvage EVENTIDE
    • Melones Island Mooring Facility Equipment Rental
  • Fleet
Heavy Lift – Airplane Salvage Heavy Lift – Airplane Salvage View
Heavy Lift – Transformer Heavy Lift – Transformer View
Heavy Lift – Catamaran Launch Heavy Lift – Catamaran Launch View
Heavy Lift – Vessel Salvage Heavy Lift – Vessel Salvage View
Heavy Lift -Vessel Salvage EVENTIDE Heavy Lift -Vessel Salvage EVENTIDE View
Melones Island Mooring Facility Equipment Rental Melones Island Mooring Facility Equipment Rental View
© 2019 Manson Construction Co., All Rights Reserved. Manson is an equal opportunity employer. Privacy Policy Powered by SoSimple

Connect