Manson Construction Company
  • Careers
  • Connect
  • Who We Are
    • About Us
      • Values
      • Culture
    • Values
    • Ethics
    • Culture
    • Heritage
  • What We Do
    • Services
    • Marine Construction
      • Design-Build Evergreen Point Floating Bridge and Landings
      • SFOBB Pier Demolition- Phase 2, Piers E4-E18 Foundation Removal
      • Manette Bridge Replacement
      • Middle Harbor Redevelopment Project
      • Pier 4 Phase 2 Reconfiguration
      • Port of Neah Bay Commercial Dock Replacement
      • Port of Redwood City Projects
      • TraPac Terminal Expansion, Berth 145-147
      • Port of Juneau Cruise Ship Berths
      • New Construction Ferry Terminal
      • Isla Grande Terminal Improvements, Phase I: New LO/LO Pier and Berth Dredging
      • Design-Build, P-327 Demolition and Replacement of Pier 12 and Upgrades to Pier 13
      • Mile Point Training Wall Reconfiguration
      • Elliott Bay Seawall Replacement Project
      • Rehoboth Beach Ocean Outfall
      • Pier 57 Piling and Ferris Wheel Foundation
    • Dredging
      • Channel Deepening, Los Angeles and Long Beach Harbors
      • Wilmington Harbor Maintenance Dredging FY17
      • 2015-2017 Port of Alaska Maintenance Dredging
      • Channel Islands, Channel Island and Port Hueneme Harbor Maintenance Dredging FY13-FY16
      • Maintenance Dredging Jacksonville Port Authority 2011-2016
      • MsCIP Barrier Island Restoration Cat Island Beach and Dune Fill
      • FY18 Shoalwater Dune Repair
      • Long Branch Beach Fill Nourishment
      • Murderkill River Dredging
      • Oakland Harbor Navigation Improvements, 50’ Deepening Project Phase 3E
    • Offshore
      • Six Pile Platform Removal-VR-124E
      • Removal of 8 Pile and 4 Pile Bridged Complex, High Islands A-517
      • Eight Pile Platform Removal VR 26 G
      • Deck Installation PL 18 C
      • Drillship BOP Heavy Lift
      • Four Pile Removal with a Jacket Reef – EI 254 A
      • Four Pile Removal with a Jacket Reef GI 78 A
      • Four Pile Removal with a Jacket Reef- WC 557C
    • Heavy Lift
      • Heavy Lift – Airplane Salvage
      • Heavy Lift – Transformer
      • Heavy Lift – Catamaran Launch
      • Heavy Lift – Vessel Salvage
      • Heavy Lift -Vessel Salvage EVENTIDE
      • Melones Island Mooring Facility Equipment Rental
    • Fleet
  • Work With Us
    • Clients and Business Partners
    • Subcontractors and Suppliers
    • Career Opportunities
    • Internship Program

Fleet

  • Services
  • Marine Construction
    • Design-Build Evergreen Point Floating Bridge and Landings
    • SFOBB Pier Demolition- Phase 2, Piers E4-E18 Foundation Removal
    • Manette Bridge Replacement
    • Middle Harbor Redevelopment Project
    • Pier 4 Phase 2 Reconfiguration
    • Port of Neah Bay Commercial Dock Replacement
    • Port of Redwood City Projects
    • TraPac Terminal Expansion, Berth 145-147
    • Port of Juneau Cruise Ship Berths
    • New Construction Ferry Terminal
    • Isla Grande Terminal Improvements, Phase I: New LO/LO Pier and Berth Dredging
    • Design-Build, P-327 Demolition and Replacement of Pier 12 and Upgrades to Pier 13
    • Mile Point Training Wall Reconfiguration
    • Elliott Bay Seawall Replacement Project
    • Rehoboth Beach Ocean Outfall
    • Pier 57 Piling and Ferris Wheel Foundation
  • Dredging
    • Channel Deepening, Los Angeles and Long Beach Harbors
    • Wilmington Harbor Maintenance Dredging FY17
    • 2015-2017 Port of Alaska Maintenance Dredging
    • Channel Islands, Channel Island and Port Hueneme Harbor Maintenance Dredging FY13-FY16
    • Maintenance Dredging Jacksonville Port Authority 2011-2016
    • MsCIP Barrier Island Restoration Cat Island Beach and Dune Fill
    • FY18 Shoalwater Dune Repair
    • Long Branch Beach Fill Nourishment
    • Murderkill River Dredging
    • Oakland Harbor Navigation Improvements, 50’ Deepening Project Phase 3E
  • Offshore
    • Six Pile Platform Removal-VR-124E
    • Removal of 8 Pile and 4 Pile Bridged Complex, High Islands A-517
    • Eight Pile Platform Removal VR 26 G
    • Deck Installation PL 18 C
    • Drillship BOP Heavy Lift
    • Four Pile Removal with a Jacket Reef – EI 254 A
    • Four Pile Removal with a Jacket Reef GI 78 A
    • Four Pile Removal with a Jacket Reef- WC 557C
  • Heavy Lift
    • Heavy Lift – Airplane Salvage
    • Heavy Lift – Transformer
    • Heavy Lift – Catamaran Launch
    • Heavy Lift – Vessel Salvage
    • Heavy Lift -Vessel Salvage EVENTIDE
    • Melones Island Mooring Facility Equipment Rental
  • Fleet
Andrew Andrew View
Derrick #6 Derrick #6 View
Derrick #8 Derrick #8 View
Derrick #24 Derrick #24 View
Einar Einar View
E. P. Paup E. P. Paup View
Freya Freya View
Haakon Haakon View
Hagar Hagar View
Njord Njord View
Norseman Norseman View
Scandia Scandia View
Southman Southman View
Valhalla Valhalla View
Valkyrie Valkyrie View
Viking Viking View
Vulcan Vulcan View
Bayport Bayport View
Glenn Edwards Glenn Edwards View
Newport Newport View
Westport Westport View
Frank Bechtolt Frank Bechtolt View
H. R. Morris H. R. Morris View
Robert M. White Robert M. White View
Auxiliary Equipment Auxiliary Equipment View
ABS Certified (Offshore) Fleet ABS Certified (Offshore) Fleet View
© 2019 Manson Construction Co., All Rights Reserved. Manson is an equal opportunity employer. Privacy Policy Powered by SoSimple

Connect