Channel Islands, Channel Island and Port Hueneme Harbor Maintenance Dredging FY13-FY16

Port Hueneme, CA

Project Features

  • Maintenance dredging
  • Approximately 4,516,443 cubic yards of material was dredged.
  • Dredge spoils hydraulically placed on Hueneme Beach and Silver Strand Beach

Project Purpose

The Channel Islands and Port Hueneme Harbors are regularly dredged to maintain their navigation channels and to replenish local beaches suffering from erosion. Using Manson’s cutter suction dredge H.R. MORRIS crews completed this multi-year maintenance project on schedule and without disrupting operations of the busy harbor.