- Who We Are
-
What We Do
- Services
-
Marine Construction
- Design-Build Evergreen Point Floating Bridge and Landings
- SFOBB Pier Demolition- Phase 2, Piers E4-E18 Foundation Removal
- Manette Bridge Replacement
- Middle Harbor Redevelopment Project
- Pier 4 Phase 2 Reconfiguration
- Port of Neah Bay Commercial Dock Replacement
- Port of Redwood City Projects
- TraPac Terminal Expansion, Berth 145-147
- Port of Juneau Cruise Ship Berths
- New Construction Ferry Terminal
- Isla Grande Terminal Improvements, Phase I: New LO/LO Pier and Berth Dredging
- Design-Build, P-327 Demolition and Replacement of Pier 12 and Upgrades to Pier 13
- Mile Point Training Wall Reconfiguration
- Elliott Bay Seawall Replacement Project
- Rehoboth Beach Ocean Outfall
- Pier 57 Piling and Ferris Wheel Foundation
-
Dredging
- Channel Deepening, Los Angeles and Long Beach Harbors
- Wilmington Harbor Maintenance Dredging FY17
- 2015-2017 Port of Alaska Maintenance Dredging
- Channel Islands, Channel Island and Port Hueneme Harbor Maintenance Dredging FY13-FY16
- Maintenance Dredging Jacksonville Port Authority 2011-2016
- MsCIP Barrier Island Restoration Cat Island Beach and Dune Fill
- FY18 Shoalwater Dune Repair
- Long Branch Beach Fill Nourishment
- Murderkill River Dredging
- Oakland Harbor Navigation Improvements, 50’ Deepening Project Phase 3E
-
Offshore
- Six Pile Platform Removal-VR-124E
- Removal of 8 Pile and 4 Pile Bridged Complex, High Islands A-517
- Eight Pile Platform Removal VR 26 G
- Deck Installation PL 18 C
- Drillship BOP Heavy Lift
- Four Pile Removal with a Jacket Reef – EI 254 A
- Four Pile Removal with a Jacket Reef GI 78 A
- Four Pile Removal with a Jacket Reef- WC 557C
- Heavy Lift
- Fleet
- Work With Us