Manson Construction

WUT Berth Extension

Owner: Port of Tacoma
Contract Amount: $24,531,248
Location: Tacoma, WA
Project Duration: 01/2010-03/2012

The purpose of this project was to extend the Washington United Terminal 600’ and allow for the Blair dock to remain operable as an auto warehouse offloading facility. The work included the installation of a breasting dolphin, mooring dolphin, demolition of 600’ of the existing Blair dock, maintenance dredging of the existing 2,000’ berth, and the construction of a 600’ wharf extension.