dredging_header_manson
marine_constuction_job marine_constuction_job

Marine Construction

Wharf/Pier

Construction of Berths 32/33 Wharf Rehabilitation

Construction of Berth 22 Wharf Replacement, Outer Harbor

Pier T Phase III

Terminal 91, Pier 90, Berths 1, 3, 5, & 7

U.S. Navy Pier 10 & 11

Berths 57/58 Container Wharf

Pierce County Terminal Wharf Construction, Phase 2 Dredging & Slip 5 Mitigation

Pier 95 Reconstruction

Pier G Berth 236 Wharf

Maersk Pier Extension

Pier T Terminal Construction

Bridges

Outfall

Marina

Ferry Landings

Special Projects

 

Wharf/Pier

Maersk Pier Extension

Owner
Port of Tacoma

Contract Amount
$7,932,052

Location
Tacoma, WA

Project Duration
05/2001-12/2001

Project Description
The purpose of this project was to increase the total pier length of the Maersk Sealand pier to 2,200-feet-long to better accommodate large post-Panamax ships and increase efficiency.

Work involved constructing 720 LF of new wharf to the existing Maersk Pier in the Sitcum Waterway. The wharf extension is 118-feet-wide, vertically supported by 24-inch diameter prestressed concrete piles and laterally supported by steel pipe piles under the inshore bulkhead. The wharf deck has cast-in-place concrete pile caps and prestressed concrete deck panels. Crews also installed a steel sheet pile wall under the inshore bulkhead for slope stabilization. Additional work included extending the pier crane rail, a high energy absorbing fender system and utility services.

 

 