Design-Build, P-327 Demolition and Replacement of Pier 12 and Upgrades to Pier 13

Owner: NAVFAC, Southwest
Contract Amount: $79,523,000
Location: San DIego, CA
Project Duration: 09/2011-10/2013

The purpose of this project is to replace the existing Pier 12 with a new general purpose berthing pier and to provide upgrades to Pier 13 at the San Diego Naval Base. The project consists of demolishing the old Pier 12, dredging approximately 350,000 cubic meters of material, driving 512 each 24” octagonal piles, constructing a new 1,500’ long and 117’ wide concrete pier, and upgrading the electrical systems at Pier 13.